>
Workshop Equipment >
Karakuri >
Upturn Layering Pick-up and Drop Turnover TruckNO.:ERETER003142
·After taking out the work piece, the empty layer frame springs up to take out the unit of the work piece from the lower layer frame. The work piece does not contact each other when stacked. It can be used as a trolley to move the finished product or as a transfer trolley in the production line.
·After taking out the work piece, the empty layer frame springs up. After the layer frame springs up, the aluminum tube slides and is fixed in the state of spring up. Because of the light weight of the aluminum tube, the operability is still in perfect condition even if the layer frame springs up for many times.
Through the special dynamics simulation and according to the actual use condition, make the exclusive scheme.
Information, please look forward to it!